A batch fails QC and the order it was for is now at risk

When a batch fails a quality check, Tremaux works out everything it touches: the order it was meant for, the stock to hold, the material to re-order and the line time to re-plan. Each team gets its next action ready to approve in its own system.

  1. Spots it early
  2. Works out what’s at stake
  3. Each team’s action, ready
  4. Records what worked

What usually happens

Quality raises the non-conformance. The fix on the floor is quick.

The rest takes hours. Stock gets held in the ERP, planning gets told, someone checks whether the material can be replaced in time, and someone tells the customer. Most of it runs on phone calls and a spreadsheet, and the same failure costs the same time again next month.

What Tremaux does

  • Picks up the failed result from your QMS or lab system.
  • Drafts the stock hold, flags the affected order and lines up the replacement material, each for the right person to approve.
  • Brings the context with it: what happened last time, what was tried, who signed it off.
  • Records the outcome, so repeat failures get handled faster and caught earlier.
  • When the same failure keeps coming back, raises an action with the quality or operations director, with the options worked out: change the supplier, the spec or the process, and what the failures have cost so far.
  • Quality

    Approve

    Hold remaining stock from the batch

  • Planning

    Approve

    Re-plan Thursday’s run

  • Quality directorEscalated

    Approve

    Approve a second packaging supplier: four failed batches this quarter

How far the action reaches

  1. Today

    The batch

    Stock is held, material re-ordered and the run re-planned.

  2. This week

    Quality and purchasing

    The cause is traced to a material, a supplier or a step in the process.

  3. When it keeps happening

    Leadership

    Options to stop it for good: a new supplier, a new spec or a process change.

The longer Tremaux runs, the earlier each action arrives.

Who it’s for

Manufacturers where a failed batch has knock-on effects for orders and materials: FMCG, food and drink, packaging, automotive parts.

FAQ

Does Tremaux replace our QMS?

No. The non-conformance stays in your QMS. Tremaux handles the work it sets off in every other team.

What happens to our CAPA process?

It stays as it is. Tremaux records what was actually done around it, so your CAPA has better evidence.

Who approves the actions?

The person who owns each one. The planner approves the re-plan. Purchasing approves the re-order.

One system, every moment

This is one of the moments Tremaux handles. It’s the same system in every one: it learns how your business really runs, sends each team’s next step to the right person, and keeps what worked. You start with one workflow and add more as you go.

See it on one of your own disruptions.